2014-11-13 STORK meets OpenNCP: Situation point

Date

Attendees

Goals

  • Follow-up of STORK 2.0 implementation (UC 2 and UC3);
  • Follow-up on OpenNCP installation in Austria and pilot with Switzerland;
  • Preparation of Tconf on the 20th November, for Pilot AT/CH kick-off;
  • Contract issues

Discussion items

TimeItemDecisions Taken
45 min

Follow-up of STORK 2.0 implementation (UC 2 and UC3);

 

30 min

Follow-up on OpenNCP installation in Austria and pilot with Switzerland

 
15 min

Preparation of Tconf on the 20th November, for Pilot AT/CH kick-off

 
5 min

Contract issues

 

Action items

  • Thomas Fleischmann Make machine available for remote access not later than 14th November, 9AM CET