Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

 

Estimated: 12:00 to 13:00 CET.

Performed:  to  CET.

Agenda

  1. Housekeeping
  2. Status
    1. Gap analysis FH Dortmund Terminology Server
      1. Gap analysis Data model
    2. Synchronization FH with OpenNCP in compliance with CTS2
      1. TSAM adaptations vs. new TSAM?
    3. Management of the different code systems
    4. Update on upload MVC from 2 countries & introduce it in the server
  3. Next meetings

Location

  • AdobeConnect:

http://ec-wacs.adobeconnect.com/openncp/
Room Passcode:  markus.kalliola or michele.foucart
------------------------------------------------------------------------------------------------
If you have never attended an Adobe Connect meeting before:
Test your connection: http://ec-wacs.adobeconnect.com/common/help/en/support/meeting_test.htm
Get a quick overview: http://www.adobe.com/products/adobeconnect.html
Adobe, the Adobe logo, Acrobat and Adobe Connect are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries.
------------------------------------------------------------------------------------------------

Giorgio Cangioli

Marta Terron Cuadrado

Marcello Melgara

 

Support documents:

Data model: /wiki/spaces/ncp/pages/80281625

/wiki/spaces/ncp/pages/77758510 : 3 documents:

  • D3.9.1 Appendix A
  • WP3 9  specifications TSAM
  • TSAM CTS2 mapping:  a comparison made at the epSOS time between the LTR structure and the CTS2 data

Meeting Notes:

  1. Housekeeping
  2. Gap analysis FH Dortmund Terminology Server
    1. Uses cases
      1. status issue import
    2. Gap analysis Data model
      1. integration of CTS2 mapping from Giorgio's doc
        1. Robert Muetzner: edited /wiki/spaces/ncp/pages/80281625 → corrected mapping tables and attribute, marked table changes with my name
  3. Synchronization FH with OpenNCP in compliance with CTS2
    1. TSAM adaptations vs. new TSAM
      1. detailed technical specs of the API.  Giorgio Cangioli 
  4. Management of the different code systems (file format, how to import, what is the update mechanism (e.g; 2 release of code systems; others might have continuous updates...))
  5. Update on upload MVC from 2 countries & introduce it in the server
    1. Can upload MTC as attempt (unofficial). MVC already loaded
      1. Most of the translations come from MTC1.8 (full MTC). Code systems loaded: EDQM, 
      2. most of codes of MVC 2.0 are already there (except terms loaded in the new code system version... not yet translated)
      3. We can start...
  6. Next meetings

 

 

 

  • No labels