Goal

  • Clearly identify within the Technical Committee (and possibly the Steering Committee) the main improvements/requirements for OpenNCP, along with the related information:
    • their status;
    • type (new feature; improvement; bug fix;);
    • business value;
    • estimated effort;
    • timeline.

Background and strategic fit

Important to define what must be taken in consideration until the end of 2015 (before the Hand-Over), and to propose new improvements/requirements for 2016.

Assumptions

Based on to the Roadmap Analisys Meeting of the Technical Committee (here), the following matrix is under development. This page is intended to be a template. 

  1. Help from the Technical Committee needed to fill the missing information - Short Description and Type - on the matrix below.
  2. This page will then be cloned for each member of the Technical Committee to fill the matrix.
  3. Each member fills the remaining fields of the matrix according to his own vision, opinion, concerns... And add new lines if some improvements/requirements are missing.
  4. Matrix results evaluation and discussion in a forthcoming meeting.

Functional Requirements 

#RequirementsStatusShort descriptionType*

Business Value

(0-lower 5-higher)

Effort needed

(in hours)

Proposed Timeline

(2015 or 2016)

Timeline Expectation

(2016 or 2016)

Obs.
1Non-­Repudation token creation, integrate with a repository to keep these records and build also a UI for viewing and exporting them.In Progress

The non-repudiation token are being created during all IHE requests (XCPD, XCA) and portal (NCP-B) requests and for now being stored in filesystem.

They should stored in database and give an easy way to administrator to browse and search or export them.

   2015 

Needed a CLEAR PICTURE on what to implement.

2eID Patient Identification (from e-SENS)In ProgressIntegration with OpenNCP Level 1 (LARMS) and Level 2 (LAM).   2015  
3SMP Integration with OpenNCP (from e-SENS).In Specification    2016  
4

CTS2 compliance in:

  • tsam sync, 
  • tsam export;
In RoadMap    2016  
5

Centralised GUI - for invoking epsos services like:

  • tsam sync, 
  • tsam export;
In RoadMapThe TSAM Sync and TSAM export are epsos utilities that only can be run from command line. It would be easier to create a contol center from which all these activities could be executed and logged. We could keep some execution details such as execution date, user has started the execution, result of execution. We could also add notification services for the status of the execution in order the administrator to be notified    -  To be better described
6Centralised GUI - configuration properties change (GUI for epsodb) In RoadMapIn the current situation the configuration parameters (epsosdb) is being changed by getting access to mysql. We should create a small application/portlet for CRUD operations in epsosdb database and also keep log of changes being made in this database    -  To be better described
7Centralised log for all the epsos activities (possible extension of audit logs), and UI for browsing this logIn RoadMap It is in relation with previous (point 6) of roadmap. If we manage to handle all epsos activities from a gui, then it would be useful to have a centralized log to see the status of all executed services and the heartbeat of the services.    -  To be better described
8eADC (Automatic Data Collecter) improvements to keep useful information. It needs to be revised what is kept now and maybe be extended
  • Centralised GUI for browsing and searching eADC data

  • Main purpose of this component was "Secondary Use of data and in second place statistics"
In RoadMap eADC, is a component made for keeping statistics about transactions made from/to countries. It has to be rescheduled in order to keep valuable data like: Home Country, Remote Country, Type of Query/Action, role of the user made the action, duration of the query. We have to think if we want to keep data of the queries made (such as patient data and documents data). This is much related the purpose of the statistics.    2016  
9TSAM Synchronization Refactoring (it needs a number of hours for a synchronisation)In RoadMap      2015  

*Type: New feature; Improvement; Bug Fix; 

 

  • Beyond Patient Summary and ePrescription use cases
#RequirementsShort descriptionType*

Business Value

(0-lower 5-higher)

Effort needed

(in hours)

Proposed Timeline

(2015 or 2016)

Timeline Expected

(2015 or 2016)

Obs.
1PAC - Patient Acces (epSOS 2 Services)

(XDM functionality, what means to export the cda documents in a folder according to IHE standards, and also view this by uploading to OpenNCP Portal)

   2016  
2HCER - Health Care Encounter Report (epSOS 2 Services)

User Interface for HCER to support all sections of Patient Summary

   2016  
3

MRO - Medication Related Overview (epSOS 2 Services)

    2016  
4Enable the exchange of LABORATORY requests and results    2016  
5Enable the exchange of IMAGIOLOGY related information (images and reports)    2016  

*Type: New feature; Improvement; Bug Fix; 


Non-Functional Requirements 

#RequirementsShort descriptionType*

Business Value

(0-lower 5-higher)

Effort needed

(in hours)

Proposed Timeline

(2015 or 2016)

Timeline Expected

(2015 or 2016)

 
Obs. 
1Refactoring of nomenclature of packages and components, replacing epSOS (and other companies) specific wording toward generic eHealthNCP    2016 This does not break the licensing constraints (GPL V3) this only consist on changing nomenclature by normalised naming.
2Extension of epSOS services to can be used by mobile devices. The services have to be REST ready and will help other applications to adapt OpenNCP gateway for usage beyond epSOS    2016  
3Test StrategyInvoke eADC, Audit Manager and XCPD/XCA/XDS Validator in an asynchronous mode to increase response time of servers   2015  
4Preparation of ready to use OpenNCP images using Docker or other alike technologies for easier installation    2015  
5Stress testing of OpenNCP components to assure that they can handle significant number of concurrent users    2016  
6Security tests of OpenNCP bundle to assure that they are ready for LIVE DATA    2015 * Markus will provide results