20160203 - Meeting minutes, Wednesday February 3rd 2016 - Task force SML/SMP
Feb 3, 2016
Estimated: 13:00 to 14:00 CET.
Performed: 16:00 to 17:00 CET
Agenda
Introduction:
Approval of previous meeting minutes
Approval of the agenda
Update on action items of previous meetings
Feedback on the Impact assessment made by DIGIT
Status from DIGIT
Consultation on RfCs SMP
Business Analysis
Status of the integration of the SMP with OpenNCP:
Impacts on the specification
Technical documents to be modified
Impacts on the implementation
Cache mechanism design
Assertions
Milestones
Connectathon
AOB
Next meeting
Location
AdobeConnect:
http://ec-wacs.adobeconnect.com/openncp/
Room Passcode: markus.kalliola or michele.foucart
------------------------------------------------------------------------------------------------
If you have never attended an Adobe Connect meeting before:
Test your connection: http://ec-wacs.adobeconnect.com/common/help/en/support/meeting_test.htm
Get a quick overview: http://www.adobe.com/products/adobeconnect.html
Adobe, the Adobe logo, Acrobat and Adobe Connect are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries.
------------------------------------------------------------------------------------------------
Participants
João Pedro Cunha Gonçalves
S
Massimiliano Masi
Uwe Roth
Yacoubou WAOLANY
Adrien FERIAL
Yves ADAM
Support documents
See section OpenNCP TF001 - Configuration Management to SMP/SML where all support document are published:
DIGIT impact assessment on SMP/SML
SMP version 0.6
Meeting Notes
Introduction:
Approval of previous meeting minutes
No comment on the last Meeting Minutes
Approval of the agenda
4b: Assertions: this topic is not really related to SMP/SML
It was reported because mentioned in the last meeting, but can be removed if not relevant
Update on action items of previous meetings
Progress on the business analysis
Comment received from Joao
Feedback on the Impact assessment made by DIGIT
... provided feedback on the analysis by e-mail on 26/01. Main points discussed:
Miss use of the Syncapp terminology, this script has no particular name. Page 20, figure 7: it's not "SyncApp" but the central services internal script.
...: Ok to correct
Configuration of VPN automatically done by NCP B. Page 27, figure 15: configuration of VPN may not be automatically done by NCP-B (e.g. we in Portugal have to do it manually), although the diagram is OK in a high-level perspective.
...:Will update: that it is not mandatory
TESTA seems interesting, removing the burden of a dedicated VPN (one of the points that creates more struggles in configurations and one which hasn't been addressed in order to clarify/simplify, like it was done with the OpenNCP installation manual). It also eases the DNSSEC requirement.
...: Ok to update
Certificate should be valid for maximum of 1 year. Why? It is a SHOULD not a MUST
eDelivery: 3 years; best practice: epSOS; 3 years is still acceptable so no update
Page 35: Note: The NCP administrator will use the NCP signing certificate to sign and push the SMP metadata.I'm not sure if this is assuming the dedicated-PKI solution, but in the current one the SMP files should be signed by the scheme operator and not by the NCP signing certificate (that's a relaxation).
scheme operator : certificate issued by a CA, used to sign the TSL
...: It is more a matter of configuration so no need to update
Roadmap:
Jan-Apr: deployment of current version of SMP (same as the one hosted by UNIPI) in DIGIT. That is the version towards which development of GET interface must be done. Will that SMP be available for the developments (ending in March) or do we need to continue with UNIPI? Do we need server hosted at the University or DIGIT will provide?
...: DIGIT will provide an environment.
From beginning of April to end of May there's "Development | Documentation" square in SANTE. Are those developments the adaptations to the new SMP version? Adaptations to the new SMP version?
...: In the beginning you'll have to mock the SMP based on the business analysis document
Only 1 month between phase 1 and phase 2 of the migration
... In September, we'll end phase 1. Then we can start the 2nd phase, but planning will depend on the MS
... will provide a more detailed feedback to ...'s e-mail and make the corrections required
Under which umbrella this migration will be made? eSENS? Who will be coordinating it?
... will need to be coordinated by DG SANTE => ... to confirm with ...
Status from DIGIT
Consultation on RfCs SMP
...: there was already a note from the Technical committee on one of the change request. This note should be included.
... will send the link to the public consultation which is not public. There is a space where you can put your comments
https://webgate.ec.europa.eu/CITnet/confluence/display/CEFCOLLAB/Consultation+on+RfCs+OASIS+SMP+specification - but page is only accessible to stakeholders. Massi has also access
Business Analysis (...)
Detailed feedback received from .... ... is already integrating the updates
Expecting for more comments? Massi did not receive the document...
... will send an update of the document tomorrow, including ... comments
... will send the updated document to all with the meeting minutes. It will also be published on the task force page section "workspace"
In the meanwhile, ... sent already the updated document, which is also published now in the task force area.
... proposes to go through member's feedback during our next meeting
Status of the integration of the SMP with OpenNCP:
Impacts on the specification
Technical documents to be modified - cf. epSOS change proposal which has already identified some of the impacts
Impacts on the implementation - Cache mechanism design
Still need to be analysed
What are the next steps? We should integrate cache in current OpenNCP architecture, in the way it does not take a lot of work + transition to the new architecture. Define in which component the cache should be done + find a way to implement it in an easy way
Do we have resource to implement? ... proposes that if eSENS is extended; it could be eSENS, and proposes to use the Connectathon as a milestone.
... will raise the question to ...
The Connectathon could be a good milestone according to all the participants. It should also be fine in term of timing according to ....
Assertions: Removed from the agenda
Milestones
Connectathon
AOB
Next meeting
Feb 17, 2016 13:00 14:00.Support board Task Force SMP: https://openncp.atlassian.net/wiki/x/DwBRB